E-Bike UPS
Battery benefits
Change your lead-acid solutions for a longer-lasting technology with a circular economy construction and disposal.
Cost-efficiency
comfort
Reliability
Cost-efficiency
Lead batteries
Depth of discharge 50%: 3 are needed for 1.8kWh usable
Reference price: 3 x $160.000 = $480.000 + IVA
Total weight: 30 kg x 3 = 90 kg.
Andes E-Bike Battery UPS
Depth of discharge 100%: 1.8kWh useful
More economical installation as no structure is required and less cabling is used
Total weight: 15 kg.
comfort
Lead batteries
Spacious and not very aesthetic: needs a dedicated room
Andes E-Bike Battery UPS
Faster installation.
Can be idle or racketed – Can be left next to the consumer – Can be added to telecommunications racks
Reliability
Lead batteries
Duration less than 5 years.
One battery fails, they all fail
Andes E-Bike Battery UPS
Duration up to 10 years.
Modular